<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/">
	<channel>
		<title><![CDATA[IRSE Exam Forum - 2004]]></title>
		<link>https://irse.signalpost.org/</link>
		<description><![CDATA[IRSE Exam Forum - https://irse.signalpost.org]]></description>
		<pubDate>Tue, 11 Aug 2026 15:44:28 +0000</pubDate>
		<generator>MyBB</generator>
		<item>
			<title><![CDATA[2004 Headway Calcs]]></title>
			<link>https://irse.signalpost.org/showthread.php?tid=409</link>
			<pubDate>Sat, 27 Mar 2010 10:41:01 +0000</pubDate>
			<dc:creator><![CDATA[<a href="https://irse.signalpost.org/member.php?action=profile&uid=148">alexgoei</a>]]></dc:creator>
			<guid isPermaLink="false">https://irse.signalpost.org/showthread.php?tid=409</guid>
			<description><![CDATA[Hello Peter,<br />
<br />
Sorry for not making the deadline of 26th March 2010.<br />
<br />
Appended please find my workings.<br />
<br />
I have some questions please:<br />
<br />
1 While the calculations show that 3 aspect signalling can support the headway requirements, the model answer has 4 aspect signalling in the vicinity of Station D.  How was this conclusion arrived at?  I mean the calculations do not show 4 aspect is needed.<br />
<br />
2 Single Line on the Branch - I do not see the need for stopping headway calculations on the Branch.  Three aspect signalling can support the speed of 120 km/h.<br />
<br />
Look forward to your reply<br />
<br />
Thank you &amp; Regards]]></description>
			<content:encoded><![CDATA[Hello Peter,<br />
<br />
Sorry for not making the deadline of 26th March 2010.<br />
<br />
Appended please find my workings.<br />
<br />
I have some questions please:<br />
<br />
1 While the calculations show that 3 aspect signalling can support the headway requirements, the model answer has 4 aspect signalling in the vicinity of Station D.  How was this conclusion arrived at?  I mean the calculations do not show 4 aspect is needed.<br />
<br />
2 Single Line on the Branch - I do not see the need for stopping headway calculations on the Branch.  Three aspect signalling can support the speed of 120 km/h.<br />
<br />
Look forward to your reply<br />
<br />
Thank you &amp; Regards]]></content:encoded>
		</item>
	</channel>
</rss>