Dear Members,
I have attempted 2009 Signal control table. I have tried the following Routes 416B(M/C), 365A(M/W/C), 371D.
Layout and solution is attached for your reference. Kindly have a look and give your comments for my further enhancement.
Assumption : In the layout Clearance Point (CP) details are not given so unable to consider the fouling track for signal aspect control.
Thanks in advance.
Regards,
NJK