Over the last weeks the London Study group has considered the part question
A new control centre is to be used for centralised control of a complex line or network. What features should be included in the design of its systems in order to achieve sufficient availability for its purpose in a cost effective manner?
The attached isn't a model answer; apart from anything else it is longer than could realistically be achieved and would need to be less explanatory and more tersely focussed on the essentials to answer the question, but it should be a good source of the sort of material from which such an answer can be constructed.
A new control centre is to be used for centralised control of a complex line or network. What features should be included in the design of its systems in order to achieve sufficient availability for its purpose in a cost effective manner?
The attached isn't a model answer; apart from anything else it is longer than could realistically be achieved and would need to be less explanatory and more tersely focussed on the essentials to answer the question, but it should be a good source of the sort of material from which such an answer can be constructed.
PJW