Hi All
I've attached the headway calcs that I presented to the London Study Group last week. Any thought then I'd be delighted to hear of them. One concern was that I had picked the wrong train length (passeger 200m) for the distance from Green to Red - I still think that that's the correct thing to do:
What do you think?
I'll be working on non-stopping headway for this module in a months time, or so. I'd be keen to see how anyone else handles this
Douglas
I've attached the headway calcs that I presented to the London Study Group last week. Any thought then I'd be delighted to hear of them. One concern was that I had picked the wrong train length (passeger 200m) for the distance from Green to Red - I still think that that's the correct thing to do:
- because the maximum speed on the line can only be achieved by the passenger train; &
- even if I've gotten it wrong then a matter of 200m isn't going to kill anyone is it?
What do you think?
I'll be working on non-stopping headway for this module in a months time, or so. I'd be keen to see how anyone else handles this

Douglas

