As said above, I suggest you make it just like it
Andrei Module 7 5 31,620 01-08-2017, 07:28 PM
    Thread: North West Study Group 2017
Post: RE: North West Study Group 2017

I would be definitely interested. please give me more info ;)
Andrei Set up a Study Group 3 19,503 01-08-2017, 07:25 PM
    Thread: IET Railway Courses
Post: RE: IET Railway Courses

Anybody know about similar courses anywhere in the future?
Andrei More event details 2 18,871 01-08-2017, 07:21 PM
    Thread: Halo and Welcome
Post: RE: Halo and Welcome

Hi Peter Thanks for the guidance, I've contact several IRSE member and fellow in UK which sign my log book and they are willing to sign off my application. Today I was contact by one of IRSE cont...
Lismana Introduce yourself 4 27,923 13-02-2013, 03:07 AM
    Thread: Halo and Welcome
Post: RE: Halo and Welcome

Hi Dorothy, Thanks for the response, Just have quick look and registered on above site suggest. I've founded one IRSE contact officer in Indonesia and directly send mail questionary. Wishes will...
Lismana Introduce yourself 4 27,923 12-02-2013, 03:11 PM
  Smile Thread: Halo and Welcome
Post: Halo and Welcome

Hi All, This is my first forum entry here event not yet be a IRSE member (Hopely Soon). Hop to have a great stay. A warm thanks to forum admin for accepting me as forum member. I have joined a r...
Lismana Introduce yourself 4 27,923 12-02-2013, 03:33 AM
    Thread: 2012 Reults
Post: RE: 2012 Reults

Hi, I have attempted module 2 & passed. Though the question was little different this year, getting the basics right & practising past question papers given the success. I thank the members for the...
savitha kandasamy Waiting for the postie..... 18 106,599 07-01-2013, 09:36 AM
    Thread: GK/Rt0044 - Provision & use of facilities
Post: GK/Rt0044 - Provision & use of facilities

Hi members, In GK/RT0044 , sec 4.1.2 has the following wordings. "At each location where facilities are provided to signal trains onto Occupied Lines, the Infrastructure Controller shall specify ...
savitha kandasamy Principles Queries etc 3 30,302 11-12-2012, 09:12 AM
    Thread: residual risk
Post: residual risk

Dear Members, I couldn't able to understand about residual risk. Kindly provide an example to understand about residual risk. Regards, saitha
savitha kandasamy Miscellaneous topics 4 33,777 25-11-2012, 04:20 AM
    Thread: Risks associated with signal lamp failure
Post: Risks associated with signal lamp failure

Hi, During a discussion about Lamp checking relay, I was informed that in certain Railways in Europe, if a lamp fails , the signal will go blank. But I am unable to get any further information rega...
savitha kandasamy Miscellaneous topics 1 25,924 19-10-2012, 05:08 AM
    Thread: Q3 Configuration Management
Post: RE: Q3 Configuration Management

Configuration management (CM) is a process for establishing and maintaining consistency of a product’s performance and functional and physical attributes with its requirements, design and operational ...
veishal 2011 Mock Mod1 1 23,292 10-10-2012, 08:07 AM
    Thread: Q2 Safety related / safety critical system design
Post: RE: Q2 Safety related / safety critical system des...

There are three aspects which can be applied to aid the engineering software for life-critical systems. First is process engineering and management. Secondly, selecting the appropriate tools and envir...
veishal 2011 Mock Mod1 4 34,256 10-10-2012, 07:58 AM
    Thread: mod 2 feedback
Post: mod 2 feedback

Dear members, First I was surprised to see the question paper. Panicked. Everything was out of control after that. Frankly to say, not able to concentrate on the operating requirements. Couldn't a...
savitha kandasamy Candidate feedback re exams 2 19,529 07-10-2012, 05:32 PM
    Thread: 2002 Mainline Layout answer
Post: RE: Mainline Layout 2002

Hi PJW, with reference to your 2002 solved layout, I have one query. For upbranch, AHBC has a treadle placed near to SIP(40 sec).. My understanding is that, if a signal happens to be placed within th...
savitha kandasamy 2002 8 46,536 20-09-2012, 12:56 PM
    Thread: App W , Activity 1A , Q9 from study pack
Post: RE: App W , Activity 1A , Q9 from study pack

hi, I made modifications to the answer & tried to understand the concept by plotting in graph. Kindly review it. savitha
savitha kandasamy Study Pack exercises 3 25,731 17-07-2012, 05:23 AM
    Thread: App W , Activity 1A , Q9 from study pack
Post: App W , Activity 1A , Q9 from study pack

Dear Members, I solved Q9 in Appendix W, Activity 1A from study pack. Kindly review it. savitha
savitha kandasamy Study Pack exercises 3 25,731 06-07-2012, 04:34 AM
    Thread: Appendix W, Activity 1A - Q8
Post: RE: Appendix W, Activity 1A - Q8

PJW Wrote: (25-06-2012, 12:43 PM) -- Generally seem to have made a good attempt. You correctly determined that it is the passenger train rather than the freight train which is the more onerous con...
savitha kandasamy Study Pack exercises 5 37,021 03-07-2012, 05:16 AM
    Thread: Appendix W, Activity 1A - Q8
Post: RE: Appendix W, Activity 1A - Q8

Peter Wrote: (24-06-2012, 04:36 PM) -- savitha kandasamy Wrote: (24-06-2012, 12:44 PM) -- Hi, I solved the Q8 of Appendix W. Please review it. regards, savitha -- I assume that this is from...
savitha kandasamy Study Pack exercises 5 37,021 25-06-2012, 05:06 AM
    Thread: Appendix W, Activity 1A - Q8
Post: Appendix W, Activity 1A - Q8

Hi, I solved the Q8 of Appendix W. Please review it. regards, savitha
savitha kandasamy Study Pack exercises 5 37,021 24-06-2012, 12:44 PM
    Thread: Q9 Methods of Degraded Mode Operation
Post: RE: Q9 Methods of Degraded Mode Operation

sometimes for the last few of trains on the Saturday evening to be able that performance could get begun on one unique areas a big amount of several hours preceding to the accomplish of service, rathe...
danieljinjin 2011 Mock Mod1 6 47,207 04-04-2012, 03:30 AM