IRSE Exam Forum
2004 Q3 NEW ATP AND SIL REQUIREMENT - Printable Version

+- IRSE Exam Forum (https://irse.signalpost.org)
+-- Forum: MODULES (https://irse.signalpost.org/forumdisplay.php?fid=3)
+--- Forum: Module 1 (https://irse.signalpost.org/forumdisplay.php?fid=4)
+---- Forum: Past Paper attempts (https://irse.signalpost.org/forumdisplay.php?fid=79)
+---- Thread: 2004 Q3 NEW ATP AND SIL REQUIREMENT (/showthread.php?tid=260)



2004 Q3 NEW ATP AND SIL REQUIREMENT - Douglas - 17-07-2009

Again I shared my old answer with the Study Group, Mr Fenner has added to it in red.

When I studied for the exam I used this table to learn about the key points for a Cab Signalling question. I could literally reproduce the table in 8(?) minutes flat, but I also understood it, so I could draw on the knowledge to answer an essay question. It is apparent when reading that I had systems in mind, these were:

NR lineside signals and TPWS - OSS and TSS;
NR lineside signals, & BR ATP or Level 1 ETCS; &
Level 2 ETCS no overlay on a high speed line.

Of course I would of stated these assumptions to add context to my answers, various of my comments are not valid for Level 2 ETCS no overlay on a slow windy little single line with lots of locally monitorred level crossings.


RE: 2004 Q3 NEW ATP AND SIL REQUIREMENT - dorothy.pipet - 06-11-2015

2004 Question paper FYI